Knowledge Hub search
Integration of substations into DHC networks
Description
This report has been produced in the context of the FLEXYNETS Project. It summarises how substations can be connected to the network, including for example specific issues related 2-pipes and 1-pipe options. Simplified parametric analyses of FLEXYNETS networks are described in several possible scenarios, comparing its performance against conventional solutions.
Performance indicators and analytical estimates on distribution losses and pumping consumptions, network thermal balancing and primary energy consumptions, as well as several techno-economic scenarios are reported.
Key Topics
- Technology
Type of Content
- Report / Study